Module APS · Metalya APS

Advanced Planning & Scheduling

The factory navigator: from customer order to shipment, planned on real capacity.

Why it matters

Metalya APS is integrated with the shop floor and kept up to date with data from operators and machines. It lets you follow the whole production path from customer orders to shipping orders in a digital dashboard, so you can react quickly to unforeseen events. When materials arrive, tasks finish early or late, or a machine stops, the plan is recalculated on the latest data.

  • Plans you can deliver

    Scheduling on the finite capacity of machines, people and equipment produces feasible plans.

  • Fast reaction to events

    Material arrivals, delays and machine stops update the plan proposal on the latest data.

  • Reliable delivery dates

    Capable to Promise checks current capacity and load before a date is given to the customer.

Replanning demo

See the impact. Decide. Release.

Pick a disruption. Compare doing nothing with a replanned draft — then release it.

Choose a disruption
Simulated demo · illustrative data

Released plan for today: 8 orders across 5 machines. Pick a disruption to see how the plan reacts.

Late orders0±0
Machine utilization44%±0
Estimated completion20:35±0
Capacity impact0 hno change
Order-by-order view
Orders, due times and estimated completion for the current phase
OrderProductDueCompletionStatus
WO-4803Frame FR-3011:3009:15On time
WO-4807Cover CV-1815:0010:10On time
WO-4801Bracket BR-1216:0013:45On time
WO-4802Cabinet door CD-419:0015:25On time
WO-4804Base plate BP-720:3018:40On time
WO-4805Housing AX-9022:0016:50On time
WO-4806Support arm SA-222:3019:20On time
WO-4808Panel PN-5500:0020:35On time

Key features

What it does

  • 01

    Complete visibility on planning

    A single view of the production flow, from the entry of sales orders to the shipment of the finished product, with the required material lists and work sequences.

  • 02

    Material requirements

    Calculates material requirements and shortage lists with expected delivery dates, so missing materials are supplied in time and delays are avoided.

  • 03

    Finite-capacity scheduling

    Schedules machines and labour on the actual capacity of each work centre and its calendar, taking into account constraints such as equipment, people, space and energy. The result is a realistic, feasible plan and better on-time delivery.

  • 04

    Interactive Gantt

    Visualisation, highlighting, analysis, lot split and drag & drop let planners adjust the proposed plan and share it across teams.

  • 05

    What-if scenarios

    Simulate different operating scenarios and compare the effects of alternative scheduling choices before committing to one.

  • 06

    Event-driven rescheduling

    Recalculates an updated plan proposal when events occur, considering ongoing and blocked activities, material delivery dates, order priorities and secondary resources. The planner reviews and releases it.

  • 07

    Capable to Promise (CTP)

    Answers customer enquiries on availability and delivery dates by checking current capacity and load, and proposes a date the company can realistically meet.

  • 08

    Analysis and reporting

    Configurable dashboards and visual tools show the main scheduling and production indicators, helping you monitor performance and find areas for improvement.

Scheduling engine

A schedule you can actually run.

Finite capacity

Every operation placed on a machine with real availability: plant calendars, shifts, parallel capacity and maintenance windows.

Setups that matter

Sequence-dependent setups by product attributes — colour, tooling, material — with forbidden transitions.

Constraints

Hard and soft constraints in versioned profiles; crews, skills and secondary resources when you model them.

Material availability

Work starts only when stock or incoming purchase orders cover it; lots, expiry and substitutes considered; pegging to customer orders.

Dispatch strategies

Earliest due date, shortest processing time, critical ratio, bottleneck-first, setup- or cost-minimising, forward or backward.

Unscheduled, explained

Operations that cannot be placed are listed with the reason — no compatible machine, no time window, or a blocking predecessor.

Scenarios & decisions

Every plan is a version. Every change, a decision.

Plans move through a lifecycle. What-if scenarios branch from any version, are calculated on an isolated copy and compared before anyone commits.

  1. 01Draft
  2. 02Calculated
  3. 03Validated
  4. 04Approved
  5. 05Published
  • What-if

    Scenario branches

    Change machines, operators, orders, routings or materials in a branch; compare KPIs and the diff with the current plan.

  • Events

    Impact analysis

    Progress, completions and disruptions from production feed an impact analysis that prepares a draft — never an automatic publication.

  • CTP

    Capable-to-promise

    Quote delivery dates against current load and capacity; a confirmed quote can become a sales order.

  • KPIs

    Measured plans

    On-time rate, lateness, utilisation, bottleneck load, setups, lead time, WIP and cost — each with a declared formula.

A disruption, minute by minute

Production plans meet reality.

Planning runs on the same orders, machines, materials and progress as production. When reality changes, the impact is calculated at once — and a planner decides what to release.

  1. Plan released

    Plan v14 goes to the shop floor. Every work stage has a machine and a time.

  2. Press brake B stops

    The operator declares a downtime with its reason. The event reaches Metalya APS.

  3. Capacity changes

    Impact analysis recalculates from current progress: started work stays where it is.

  4. Orders at risk

    A draft scenario shows which orders would finish late and by how much.

  5. Updated plan released

    The planner releases v15. The shop floor receives the new sequence.

The factory navigator

Like a satellite navigator that recalculates the route when traffic changes, Metalya APS keeps the plan connected to what actually happens on the shop floor. Operators and machines report progress continuously, so every recalculation starts from the real situation, and the planner decides which proposal to release. Typical events that lead to an updated plan include the following.

  • Material availability

    Arrivals or delays of raw materials and components change the dates on which operations can start.

  • Tasks finished early or late

    An operation that ends ahead of or behind schedule shifts the operations that depend on it.

  • Machine downtime

    A stop on a work centre reduces its available capacity and is taken into account when the plan is recalculated.

  • Changing priorities

    When an order becomes more urgent, its new priority is reflected in the next plan proposal.

Buy the foundation. Adapt the experience.

See Metalya on your own production scenario: your routings, your constraints, the screens your people need.