Finite capacity planning: why reality always wins
Infinite-capacity plans look good on paper and fail on the floor. What finite-capacity scheduling takes into account — and what it needs from your data.
An infinite-capacity plan answers one question: when should each order be produced if every machine were always free? The answer is easy to compute and rarely true.
A finite-capacity schedule answers the question that matters: given the machines, people, materials and time we actually have, when will each order really be finished?
What finite capacity considers
- Resources — each operation runs on a machine that can actually do it, one job at a time (or N at a time where parallel capacity exists).
- Calendars — shifts, holidays and planned maintenance remove time from availability.
- Setups — changing colour, tooling or material costs time, and the sequence decides how much.
- Precedence — an operation cannot start before the previous one ends.
- Materials — work cannot start before the material is there.
- Constraints — rules such as “this product only on these machines” or “never this sequence”.
The data it needs
Finite capacity is only as good as its inputs: realistic times, correct routings, real calendars, current progress. That is why it works best on top of an MES that records what actually happens — and why planning projects so often turn into data-quality projects.
What you get in return
- delivery dates you can promise with confidence
- bottlenecks visible before they cause lateness
- setups grouped deliberately instead of by habit
- a baseline to measure every disruption against
Reality always wins. Finite-capacity planning simply lets you see it coming.